![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Battlegroup Harmony - GRN Destroyer Status - Printable Version +- Discovery Gaming Community (https://discoverygc.com/forums) +-- Forum: Role-Playing (https://discoverygc.com/forums/forumdisplay.php?fid=9) +--- Forum: Unofficial Factions and Groups (https://discoverygc.com/forums/forumdisplay.php?fid=67) +--- Thread: Battlegroup Harmony - GRN Destroyer Status (/showthread.php?tid=169049) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Battlegroup Harmony - GRN Destroyer Status - Insurgency Navy - 03-24-2019 ![]() Battlegroup Harmony GRN Destroyer Overhaul Status Overview The RNS Cassard has safely arrived at Marshall Station and entered the drydock. Our engineers have done extensive scans and inspections to figure out a plan to restore the vessel to a combat ready state. The hull is in good condition but most major systems are missing or dysfunctional. Currently planned system updates:
RE: Battlegroup Harmony - GRN Destroyer Status - Insurgency Navy - 03-24-2019 ![]() Power Core Supply and Engineering Status The current power core inside the ship was of makeshift civilian manufacturing. The salvaged generator of an Archer-class cruiser shall replace it to fuel the ships systems. To refit the generator for the ship we require some additional materials.
RE: Battlegroup Harmony - GRN Destroyer Status - Insurgency Navy - 03-30-2019 ![]() Wiring Harness Supply and Engineering Status The current connections within the ship need to be reworked. The wiring harness requires a considerable amount of resources to be adapted and checked fully.
RE: Battlegroup Harmony - GRN Destroyer Status - Insurgency Navy - 03-30-2019 ![]() Internal Systems Supply and Engineering Status With most of the GRN's systems removed from the vessel we will have to completely replace all internal systems with our own versions. This will be one of the most resource intensive parts of the construction.
RE: Battlegroup Harmony - GRN Destroyer Status - Insurgency Navy - 03-30-2019 ![]() Scanner arrays Supply and Engineering Status With most of the GRN's systems removed from the vessel we will have to completely replace all internal systems with our own versions. This will be one of the most resource intensive parts of the construction.
|