![]() |
||||
To: Bristol C&M || From: Starfliers - Printable Version +- Discovery Gaming Community (https://discoverygc.com/forums) +-- Forum: Role-Playing (https://discoverygc.com/forums/forumdisplay.php?fid=9) +--- Forum: Communication Channel (https://discoverygc.com/forums/forumdisplay.php?fid=59) +--- Thread: To: Bristol C&M || From: Starfliers (/showthread.php?tid=208302) |
||||
To: Bristol C&M || From: Starfliers - Frostpfote - 06-24-2025
RE: To: Bristol C&M || From: Starfliers - Bristol Constructions - 06-25-2025 ![]() Incoming Transmission
![]() User ID: Chellew, Senara Recipient: Pearsall, Nataly Subject: Docking Modules . Good afternoon Ms. Pearsall, Thank you for reaching out to Akutan Production Facility for this matter. As far as the damage done to the recovered docking systems, I would need to know the extent of the damage sustained, what caused the damage, and things of that nature. Please forward applicable inspections and documents so the Engineering Department can have a full appraisal of how salvageable those modules are. I would make note that the modules will have to be fully certified as a result of any damage, which may incur additional costs in addition to material, labor, and storage for the docking modules themselves. As for the other systems that would need to be completed for full operational capability, and in the possible scenario that the recovered docking systems prove irreparable, of a Bustard class Carrier, our station does currently have additional docking modules available for purchase. These are already certified under Liberty’s Quality Control Act of 763. I look forward to hearing back from you soon. V/R CHELLEW, SENARA DIRECTOR, AKUTAN ENGINEERING DEPT Transmission Ends
RE: To: Bristol C&M || From: Starfliers - Frostpfote - 06-26-2025
RE: To: Bristol C&M || From: Starfliers - Frostpfote - 07-04-2025 RE: To: Bristol C&M || From: Starfliers - Bristol Constructions - 07-04-2025 ![]() Incoming Transmission
![]() User ID: Chellew, Senara Recipient: Pearsall, Nataly Subject: Docking Modules . Good afternoon Ms. Pearsall, Unfortunately the salvaged docking systems were of largely Grade 3 components and required immediate disposal to prevent contaminant spread to our assembly areas. I can, however, say that enough systems were recoverable and have since been refurbished and assembled into complete docking systems. Akutan’s Quality Assurance team has tested the system and approved its use under the Liberty Quality Control Act of 763. I regret to inform you, however, that the disposal costs of the Grade 3 materials have largely negated the cost savings. As such the docking systems will cost the standard amount. Akutan Production Facility is standing by to install the systems on board the Starfall. I look forward to hearing back from you soon. V/R CHELLEW, SENARA DIRECTOR, AKUTAN ENGINEERING DEPT Transmission Ends
RE: To: Bristol C&M || From: Starfliers - Frostpfote - 07-07-2025
|