• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Official Player Factions Kusari GC- Kinkaku-ji Kinkaku Construction Phase Four

Server Time (24h)

Players Online

Active Events - Scoreboard
Corsair Kills - 0 / 1,000
Lawful Kills - 0 / 1,000
Red Hessian Kills - 0 / 1,000
Unlawful Kills - 0 / 1,000

Latest activity

Pages (2): « Previous 1 2
Kinkaku Construction Phase Four
Offline The Gen'an Chrysanthemums
01-05-2021, 01:34 AM,
#11
Member
Posts: 282
Threads: 63
Joined: Dec 2017

Golden Chrysanthemum
Gen'an Cell

[Image: iHaHiX2.png]


Kinkaku-ji

Phase 4.2 Completion


The drydock has been completed and connected to the extention of Sector 3. The drydock has been reinforced with Niobium and Tungsten like the rest of the station to prevent it from becoming a weak point.

Deliveries done for the Drydock outside of this delivery manifest:
11670 units of Niobium
15575 crates of Hull Segments
19525 crates of Hull Segments

Additionally, 18,650 units of Industrial hardware of Industrial hardware and 15,000 units of Robotic Hardware has been delivered and is currently being installed and made ready for the engineers in Sector 3.




Information - Recruitment - Feedback - Database - Comm Network - Personnel Files - Faction Diplomacy
Reply  
Offline The Gen'an Chrysanthemums
01-05-2021, 11:54 PM,
#12
Member
Posts: 282
Threads: 63
Joined: Dec 2017

Golden Chrysanthemum
Gen'an Cell

[Image: iHaHiX2.png]


Kinkaku-ji

Phase 4.3 Completion


With the final units of Industrial Material delivered and installed on Kinkaku-ji, the shipyard is soon to be fully operational.

Kinkaku-ji's engineers have began their final assessment. The drydock will be thoroughly inspected for any assembly faults, the energy levels will be measured at points prone to overload, and the engineers will have to be instructed and get used to working with the new hardware.

Therefore will will gradual build up the operational status of the new Shipyard.









https://discoverygc.com/forums/showthrea...pid2208715

Information - Recruitment - Feedback - Database - Comm Network - Personnel Files - Faction Diplomacy
Reply  
Pages (2): « Previous 1 2


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode