COMM ID:Lieutenant-General Ryan Caparzo, Homeland Security, Department Chief TARGET ID:The Directorate SUBJECT:Predator Project ENCRYPTION:High
Caparzo here,
I've been tracking the operational details of the Predator Project, the G-series are performing within the standards set, we've noticed an significant increase in passive Core Defense Intelligence within Liberty. The C series, whilst not as useful, is still operating within the set standards.
We've also finished the tests on our Remote AI Node Signal Amplifiers and decided that they're ready for their first uses on capital class vessels, we've already petitioned a request to the Navy to have one installed and have it tested out.
However that means we're going to have to have more Predator units in active service, which is why I'm confirming the success of the 1st Stage of Predator Drone Service and removing the limit of 100 units. The Grise Fjord dock-master has been notified and construction has been restarted. Which brings it's own problems.
Hoover is running out of structural capacity, we're almost out of room due to all the signal amplifiers that have been installed in order to compensate for efficient trans-system control. And in order to support even more bandwidth as well as installing the required software and hardware to be compatible with the Amplification Nodes, we're going to need to both include structural upgrades on Hoover as well as relocate some system from fire-control to AI Networking.
I've already sent the required resources to Logistics, it shouldn't provide too difficult a task.