• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Official Player Factions Inter-House IMG|
« Previous 1 2 3 4 Next »
[Yuma] CR & IMG Project: The Floating City - Research & Development

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

[Yuma] CR & IMG Project: The Floating City - Research & Development
Offline Jack_Henderson
08-06-2014, 06:45 PM, (This post was last modified: 09-03-2014, 10:15 PM by Jack_Henderson.)
#3
Independent Miners Guild
Posts: 6,103
Threads: 391
Joined: Nov 2010

[Image: engineer.png]


**** SENDER: Press Release ****

**** TO: IMG & CR - Internal Document ****


Quote:
Yuma Floating City Project


Project: Shield Generator

Picture/Model:

[Image: 806804-atlantis_shield.jpg]

Description: The Shield Generator and Emitter creates a bubble made of a high energy field that deflects incoming fire. It is an adapted space station shield, changed and optimized for intra-atmospheric and marine use. The challenges of having the shield bubble inside the water took some time to be overcome, and the high energy use is still being curbed as we are speaking. Optimizing the technology will take a while, likely years, but a general protection can be provided with the version one that you can see here.

Building Time: 2 months (estimated)

Building Costs 4.00.000.000 Credits (estimated)

Shield Emitter: The Shield Emitter is a floating structure that is placed at the center of the construction site. The Emitter can be fixed to underwater, sead-bed based constructions to stabilize the shield bubble when under attack or during heavy weather. These events could make the heavy platform move too much and threaten shield level strength and integrity, so anchoring it in these cases can become essential.

[Image: lilypad-floating-cities-01.jpg]

The shield is strongest at the emission point, so government habitats and Headquarters are strategically placed next to it in this sketch. It is also possible to create more than one shield bubble from one Emitter, so depending on the operational necessities, a smaller General Shield could be used to create Inside Shields to protect certain points.


[Image: end.png]

+ IMG| DISCORD: https://discord.gg/TWrGWjp
+ IMG| IS RECRUITING: Click to find out more!
Reply  


Messages In This Thread
[Yuma] CR & IMG Project: The Floating City - Research & Development - by Jack_Henderson - 08-02-2014, 04:33 PM
RE: [Yuma] CR & IMG Project: The Floating City - Research & Development - by Jack_Henderson - 08-04-2014, 11:12 AM
RE: [Yuma] CR & IMG Project: The Floating City - Research & Development - by Jack_Henderson - 08-06-2014, 06:45 PM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode