• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Interactive DarkMap
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Unofficial Factions and Groups
« Previous 1 … 108 109 110 111 112 … 394 Next »
"The Zealous" | Test rig / Spy ship project [CLASSIFIED]

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

"The Zealous" | Test rig / Spy ship project [CLASSIFIED]
Offline Geoffacake
05-12-2015, 03:16 PM, (This post was last modified: 01-15-2016, 03:57 PM by Geoffacake.)
#7
SFX Developer / BDM
Posts: 1,132
Threads: 171
Joined: Jan 2011

SCHATTEN INTERNAL NETWORK
'Zeal's kidnapping has placed me (Geoffrey Enfield) in charge of the project until i can get her back, i just hope that we can continue the goal of this. She would of loved this.

Technical Specifications 12/04/22A.S.
Ship Name: “The-Zealous”
Ship Registry: “The-Zealous” - U-001
Ship Class: "Shukensha" Renzu Modular Liner
Power Plant: H-Fuel Reactor Turbine
Engine Type: A-J17 H-Fuel propulsion engine (Heavy Renzu Variant)
Fuel: H-Fuel
Component Updates: [None]











"Metastability" Supercomputer Construction Commencing

All components of the Super Computer has been delivered by the Hogosha, (Synth paste was personally picked up) they've been a huge hand in making this system work, Shatten's science and engineering teams have commenced construction of the system, but it won't be active until the HTTB-1 reactor is completed. This will play a key element in the use of electronic warfare against anyone who tries to cross paths, but is also purposed for utility and advanced computing, quantum processing.

The expected date for the process to be finished will be around 4-5 Days of construction with the amount of teams available since no other major projects are currently in process. Hopefully this will be done quickly for us to be able to put it to use quickly. The Liner will actually still be mobile, the components that have been delivered have been loaded aboard the ship and crews have been notified that a scientific construction team of around 50 have been picked up from Schatten and placed aboard the "Metastability" construction deck. All necessary tools have also been provided.

Quote: Lane hackers will need to be contacted to acquire some software to be able to harness the computing power that will be available with the "Metastability", another plan with this is for a high powered scanning and communications array to be hooked up to the main system, hopefully giving us the advantage for multipurpose, from simple environment scanning, to electronic warfare.

END OF LOG
Reply  


Messages In This Thread
"The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-23-2015, 11:05 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-23-2015, 11:47 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-25-2015, 05:42 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-26-2015, 07:58 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-31-2015, 06:52 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 04-11-2015, 10:58 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 05-12-2015, 03:16 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 02-24-2016, 01:17 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 02-24-2016, 02:03 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-21-2016, 01:31 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-23-2016, 03:51 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 09-14-2016, 03:18 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 11-24-2016, 02:48 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 01-24-2017, 08:00 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 01-25-2017, 12:17 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 05-18-2017, 06:06 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-02-2018, 12:42 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 03-07-2018, 05:48 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 05-31-2018, 01:12 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 06-05-2018, 05:04 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 06-06-2018, 08:07 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 06-09-2018, 12:57 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 06-11-2018, 03:50 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 07-27-2018, 12:30 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 09-04-2018, 03:23 AM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 09-10-2018, 11:47 PM
RE: "The Zealous" | Test rig / Spy ship project [CLASSIFIED] - by Geoffacake - 09-26-2018, 06:24 PM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode