• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Stories and Biographies
« Previous 1 … 154 155 156 157 158 … 677 Next »
Major Engineering log.

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Major Engineering log.
Offline Wesker
09-20-2016, 03:36 PM, (This post was last modified: 10-11-2017, 10:29 PM by Wesker.)
#1
Level 99 Boss
Posts: 5,296
Threads: 457
Joined: Nov 2014





Location: Wolfsburg Shipyard
Date: 19 September 823 A.S.




[Image: ckz4XCU.png]




Entry # 367 Chief Engineer Albert Schultz

After RHC-Yggdrasil docked one week ago and with ownership of the engine blueprints, the final engine modifications will be finished within a few days.

We extracted some of the engine components and replaced them those of our Jormungand class Rheinland MOX engines. Making the engine systems more easily repairable should they sustain any damage in combat. The Rheinland MOX engines also are more durable in the Radiated zones of the Omegas which the RHC-Yggdrasil will likely visit. The rest of the components seem to be similar if not identical to the components used by the Armee for their warships. Meaning the engine systems were the only systems in need of major modifications.

The Reactor as well as the engine systems seem to be compatible with the Rheinland MOX engines installed on the ship. The Cerberus batteries and long range cannons have been successfully installed onto the ship as well as the secondary turrets. All that remains now are the flak cannons which will require about another day or so due to their non-Rheinland origin.

The specifics behind the crew are to some extent classified. I've seen several SOA agents board the vessel since we finished arming it. Seems Fraulein Heinrich wants the best of the best commanding this thing. Not that I blame her, such beauty cannot be handled too carefully. Fraulein Heinrich has asked me to appoint some of the best engineers we have aboard the vessel. This will likely mean more work for me in due time with less assets to rely on back home. Other than that the ship should be ready to fly within two days time. The exact timing of its departure and destination are classified.

I should also probably note now that this vessel will require more frequent "check ups" due to the nature of the technology aboard the vessel. Once every 3 months the ship should be inspected for 2 days time.





[Image: P6DLUCr.png?4][Image: AX5RcTh.png?4]
Reply  


Messages In This Thread
Major Engineering log. - by Wesker - 09-20-2016, 03:36 PM
RE: Finishing touches - by Wesker - 04-17-2017, 04:46 PM
Major Engineering log. - by Wesker - 05-16-2017, 10:54 PM
RE: Major Engineering log. - by Wesker - 10-15-2017, 04:28 AM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode