We were contacted by a potential buyer for our Type-3 cloak disruptor, so after a brief meeting with the Board of Directors I went ahead and scheduled the sale and personally oversaw the transaction. Afterward I was instructed by Mr. Gunsmith to maintain production of the disruptors with the intention of having one of each type in stock on Elysium at any given time. I relayed the orders to the production facility on Elysium and using the stock that I had delivered earlier this week they have begun work on a new Type-1. Most of the materials are already on-hand, but a steady supply of Iridium remains elusive. The following shipments have been procured and delivered to Elysium by myself since my last report:
- 13,100 Energy Field Equipment from Austin Depot, Texas
- 10,000 Plasmonic Metamaterials from Graves Station, Dublin
End of message.