• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Unofficial Factions and Groups
« Previous 1 … 116 117 118 119 120 … 386 Next »
Project 10155

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Project 10155
Offline MotokoSusu
02-16-2018, 02:13 AM,
#4
Member
Posts: 304
Threads: 41
Joined: Jan 2017

::Comms Open......::
:: Prepare For Data Burst ::
:: Encryption Protocols ::
:: Decrypting.... ..... ...::



[Image: 9IPdbHQ.png]
Name: Commander Motoko Susubo

Location: Aboard ABH Capital Research Vessel Goddess Shizuha

From: Data Pad of Motoko Susubo

To: Notes to self on PROJECT 10155




The Drone has been moved from the Shizuha's hanger to the Tsukihime Propulsion Labs. It had took a good two days to move the craft to the lab, we had to do things by hand so it required many hours of space walks, in EVA's. Once in the lab teams started to remove the standard propulsion system. Other teams are checking if all the telemetry and ground station hardware are in working order.

[Image: dBo9myR.jpg?1]

[Image: O7IvP0N.jpg?1]

We are out fitting two drones with the N.I.P.S . One well be the back up if any unforeseen problems arise. I do not see any problems with the tests the systems are pretty straight forward. Most of the , if any problems well be injector pressures, neutralizing beam out put , and magnetic output. All of these are adjustable on the fly and require the teams to keep a close eye on the levels. At this point all the tanks are toped off for now and will sit till tomorrow to give them time to equalize before the last top off. Tomorrow will be the big day if everything goes as planed the N.I.P.S will be ready as a marketable engine soon. The test clocks have been set to t minus 24 hours and the launch teams are milling over data and until tomorrow Commander Motoko Susubo signing out


Encrypted Time Stamp NIPS25tfk/56erf



:: Transmission End ::


[Image: 314UyO1.png]
Reply  


Messages In This Thread
Project 10155 - by MotokoSusu - 08-28-2017, 06:21 AM
RE: Project 10155 - by MotokoSusu - 01-25-2018, 11:40 PM
RE: Project 10155 - by MotokoSusu - 01-31-2018, 08:28 PM
RE: Project 10155 - by MotokoSusu - 02-16-2018, 02:13 AM
RE: Project 10155 - by MotokoSusu - 03-21-2018, 03:55 AM
RE: Project 10155 - by MotokoSusu - 04-09-2018, 07:01 AM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2025 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode