• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Unofficial Factions and Groups
« Previous 1 … 116 117 118 119 120 … 386 Next »
Project 10155

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Project 10155
Offline MotokoSusu
04-09-2018, 07:01 AM,
#6
Member
Posts: 304
Threads: 41
Joined: Jan 2017

::Comms Open......::
:: Prepare For Data Burst ::
:: Encryption Protocols ::
:: Decrypting.... ..... ...::



[Image: 9IPdbHQ.png]
Name: Commander Motoko Susubo

Location: Goddess Shizuha

From: Data Pad of Motoko Susubo

To: Notes to self on PROJECT 10155





[Image: er8QJ2c.png?1]






This next set of tests was held away from the Tsukihime due to the nature of Shock tests. These next set of test where to determine how much stress the engines could take before a mass failure event.

The following data was recorded during the shock tests:



FLIGHT DATA COLLECTION UNIT 82-A

SHOCK TEST #1 :110% Operational Rate

GAS PRESSURE: GOGUIDANCE SYSTEM: GOMAG FIELD: GO
BEAM NEUTRALIZER: GO TELEMITRY: GOHULL PRESSURE: ACCEPTABLE
EXHAUST TEMPS: ELEVATED DELTA-V 3476.82 m/secFLIGHT TIME 1h:17m:23s

SHOCK TEST #2 :120% Operational Rate

GAS PRESSURE: ELEVATEDGUIDANCE SYSTEM: GOMAG FIELD: GO
BEAM NEUTRALIZER: GO TELEMITRY: GOHULL PRESSURE: ACCEPTABLE
EXHAUST TEMPS: ELEVATED DELTA-V 3501.82 m/secFLIGHT TIME 2h:01m:32s

SHOCK TEST #3 :140% Operational Rate

GAS PRESSURE: ELEVATEDGUIDANCE SYSTEM: GOMAG FIELD: ELEVATED
BEAM NEUTRALIZER: GO TELEMITRY: GOHULL PRESSURE: ACCEPTABLE
EXHAUST TEMPS: ELEVATED DELTA-V 3518.82 m/secFLIGHT TIME 3h:48m:24s

SHOCK TEST #4 :150% Operational Rate

GAS PRESSURE: DANGERGUIDANCE SYSTEM:DATA LOSSMAG FIELD: FAIL
BEAM NEUTRALIZER: FAIL TELEMITRY:DATA LOSSHULL PRESSURE: NO DATA
EXHAUST TEMPS: DANGER DELTA-V 3553.82 m/secFLIGHT TIME 5h:47m:12s


[Image: D6Pn0Ms.jpg?1]

THIS CONCLUDE ALL FLIGHT DATA:

Upon reviewing the data it has been concluded that the Shock tests where a success. The forth and final test data was a max fail of the engine. We had pushed that test to 150% of operational specs and left it to fly until the engine had total failure. It is safe to lock out the engines at 120% of operational rate. This will give them 20% additional emergency thrust.

The designs, and test data have been turned in to the review board
Our review board has giving this engine system the ok for commercial sales and production.
This will concluded Project 10155


Encrypted Time Stamp rEge652l77jo0



:: Transmission End ::

Reply  


Messages In This Thread
Project 10155 - by MotokoSusu - 08-28-2017, 06:21 AM
RE: Project 10155 - by MotokoSusu - 01-25-2018, 11:40 PM
RE: Project 10155 - by MotokoSusu - 01-31-2018, 08:28 PM
RE: Project 10155 - by MotokoSusu - 02-16-2018, 02:13 AM
RE: Project 10155 - by MotokoSusu - 03-21-2018, 03:55 AM
RE: Project 10155 - by MotokoSusu - 04-09-2018, 07:01 AM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2025 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode