• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Official Player Factions Edge Worlds Sirius Coalition Archive
« Previous 1 2 3 4 5 6 Next »
Project "Iron Curtain"

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Project "Iron Curtain"
Offline SCEC
03-01-2019, 10:13 AM, (This post was last modified: 11-06-2019, 04:10 PM by SCEC.)
#2
SCEC|
Posts: 421
Threads: 60
Joined: Jan 2017



For internal use only. Unauthorised access restricted.


DESIGN PROJECT 54/826/1
Rocket projectile end-stage solution and specifications

For end-stage of rocket projectile suggested usage of modified "Apocalypse" missile, already manufactured and in-service on Coalition Battlecruisers. This missile recommend itself as reliable projectile with good characteristics in long-range fleet combat. Relative low combat mass, reliable and worked out space guidance and orientation systems allow significantly reduce cost of development. After minor modifications, its can be adjusted to solid-propellant carrier stages.

[Image: 90C4sCN.png]
NOTES

Creating a proper Transport and Launch Container would become a serious problem due of using liquid fuel in end-stage. But this problem should be solved, because any alternative ways offer or less performance or significantly bigger cost of manufacturing.


Cases of disclosure the project details to unathorised parties will be considered by Commissariat.


Reply  


Messages In This Thread
Project "Iron Curtain" - by SCEC - 02-22-2019, 09:10 PM
RE: Project "Iron Curtain" - by SCEC - 03-01-2019, 10:13 AM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode