User ID: Gaston Dubois Recipient: EFL Council Subject: Infrastructure Damage .
Bonsoir, Postes au Conseil.
Following up from my previous report, repairs have been conducted on the aforementioned lane with aid from IDF Shipping who were carrying the required parts. I'll detail the repairs made below.
Segment 1
Upon removal of the protective hull panel surrounding the main circuitboard of the lane, we discovered that the shots fired by the Naval destroyer completely fried all internal circuitry. I proceeded to completely remove the circuitboard and opt for a full replacement. Upon removal the board was transfered to a secondary EFL Transport by my accompanying repair ship.
Once the new board was installed I proceeded to reinstall the quantum multiplexors onto it, using my precision welding tools with minimal issues, I then proceeded to reinstall the superconductors and replace the board onto the lane. I then sealed it back inside.
Segment 2
Once the main brace was removed from the lane an IDF Transport aided by anchoring it in place. We discovered that the superconductors and auxillary solar panels were damaged and required replacement. Petit Bateau took the task of installing the Superconductors whilst I reinstalled the panels, after I had finished installing the panels I was called to check the superconductors again as it seemed they had taken more damage than we first thought. I recommended we fully reinstall the entire component - as we had blue packs available, I proceeded to open one and install the necessary components with aid from the other repair ship. Installation was smooth and we reassembled the lane afterwards without any issue.
Segment 3
Segment 3 had no major issues, other than damaged paintwork. We were not equipped to repaint the lane and i'll ensure a work order is submitted to my supervisor to make sure this happens.
Myself and Aramis thanked IDF Shipping for their continued support of our operations. No other issues were reported with the lane and the operation proceeded entirely as planned with no worthwhile events to report. We'll continue to monitor the lane network in both Languedoc and Lorraine for the time being, until we're unable to continue operations in the region.