• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Stories and Biographies
« Previous 1 … 50 51 52 53 54 … 679 Next »
SC-Zuiryu

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

SC-Zuiryu
Offline Shimamori
06-21-2022, 07:19 AM,
#4
Member
Posts: 430
Threads: 78
Joined: Jul 2020

[Image: 50TtC9d.png]
Nomura Masami,
Chief Engineer

CONSTRUCTION LOG MESSAGE 1/21.06.829


Log, Chief Engineer Nomura. The modification is going faster than expected thanks to the advanced Kishiro assembly line. While the main hull is being finalised and the solar panels are being prepared to be adjusted by the main engine and connected to the energy grid the "horns" have already been completed and it is hightime we fitted them with the necessary equipment. The team of our engineers together with the scholars from Tenmei Daigaku put together the recent developments in quantum communication. I cannot say it is some breakthrough technology but what we managed to achieve in cooperation with the engineers of Kure and Kishiro is miniaturisation of the large array antennae commonly found on larger ship class to be fitted on "Mizu". Because of the availability of the "horns" compared to "Takeda", "Mizu" should have enough space to attack the antennae and the respective receiver. Additional pressure on the energy grid should be compensated by extra energy generation by the previously mentioned solar panels as well as optimisation of the energy core system. I suppose the communication array will be finished in a day or two after we install it and run all the necessary tests. Then we can proceed to mounting the solar panels and finalising the modification progress. This work is quite exciting, perhaps I will oversee a construction of a vessel from 0 to 100% in the future with the obtained knowledge!

[Image: ACYU0xq.jpg]
Communication Array Blueprint




Biography | Reception Office | All Honshu Network | Honshu Stock Exchange | Jobs/Recruitment | Feedback | Discord
Reply  


Messages In This Thread
SC-Zuiryu - by Shimamori - 12-03-2020, 09:53 AM
RE: SC-Zuiryu - by Shimamori - 12-07-2020, 07:10 PM
RE: SC-Zuiryu - by Shimamori - 06-19-2022, 08:19 AM
RE: SC-Zuiryu - by Shimamori - 06-21-2022, 07:19 AM
RE: SC-Zuiryu - by Shimamori - 06-24-2022, 04:20 AM
RE: SC-Zuiryu - by Shimamori - 06-27-2022, 09:34 AM
RE: SC-Zuiryu - by Shimamori - 07-01-2022, 09:11 AM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode