• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Stories and Biographies
« Previous 1 … 28 29 30 31 32 … 679 Next »
Amalfi: Project Horizon

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Amalfi: Project Horizon
Offline Fiorella de Marco
04-20-2024, 11:11 AM, (This post was last modified: 04-20-2024, 11:12 AM by Fiorella de Marco.)
#2
Apex Predator
Posts: 724
Threads: 91
Joined: May 2021

FILE: PROJECT HORIZON - CALIBRATION
Author: Fiorella A. de Marco
  • 1. Overview
    With the loss of influence of the Inner Circle, it seemed this project might have to be delayed due to the Lane Hackers' lack of personnel and resources. Fortunately, this assumption did not prove to be true.

    Although it is true that the Inner Circle lost its sway, a new group known as the Lovelace Circle promptly took its place. My contact, a lady known as "Chloe," was more than willing to meet our needs and arranged my vessel's technical assistance at Cochrane Depot.

  • 2. Implementation
    At Cochrane Depot, Lane Hackers' technicians, under the supervision of my crew, recalibrated both scanning units. The recalibration was more challenging than initially anticipated, requiring the replacement of the internal clocks of both devices and conducting quantum synchronization. The time discrepancy between the two units is unmeasurable, less than one nanosecond.

    In connection with the recalibration, our control system was reinstalled, and our main data buses were updated. Four additional control signals - AXD, AXE, AXF, and AXG - were added to each bus. Control algorithms in quantum cores A, B, and C corrected minor imperfections left by our programmers.

  • 3. Evaluation
    Both scanners were successfully installed; cooling circuits operate within set parameters, and distribution compensators have not recorded any significant increase in idle power. Both scanners have been successfully implemented into the control system, including their combined output processed in quantum cores B and C. Simulated tests were successful.

    We also received updated technical documentation from the Lane Hackers, including additional scripts to fill gaps in the automated robotic maintenance system.

    Non-simulated tests remain necessary.



Fiorella Arianna de Marco | As Dawn Mayflower
Feedback Thread
Reply  


Messages In This Thread
Amalfi: Project Horizon - by Fiorella de Marco - 03-10-2024, 12:25 PM
RE: Amalfi: Project Horizon - by Fiorella de Marco - 04-20-2024, 11:11 AM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode