I will be taking over these talks again as we've converged into the logistical side of this trade deal. I hope things are well for you over in Bering?
After reviewing the logs, I can confirm that atleast for the time being we do not need docking modules attached to the new ships. This may come down later, however.
As for the ship systems we have:
1,146 Superstructure Systems can be offered at $10,000 each to total $11,460,000. 702 Reactor Systems can be offered at $9,000 each to total $6,318,000.
We have a project of our own that could use these ships to assist, so I would ask if it is possible for us to take delivery of these ships prior to the systems deliveries. If this is acceptable to you I would ask that we take two ships now, and deliver 1/3 of the components afterwards. Each further delivery of two Bulwarks will be returned with the next third of the components until the deal is complete.
If you would like to arrange delivery of these components to your station, please let me know and we can work out pricing.
Regards,
Elena Powell, Coleraine Distribution Centre Managing Director