• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Stories and Biographies
« Previous 1 … 7 8 9 10 11 … 675 Next »
Oblivion Forge | Station Projects

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Oblivion Forge | Station Projects
Offline Oblivion Forge
06-02-2025, 12:24 PM,
#1
Member
Posts: 15
Threads: 6
Joined: Mar 2025

[Image: vXGiTDK.png]
Project Report: Expansion of Cargo Storage Facilities



Sector 5E, Magellan System

Executive Summary


This report outlines the comprehensive plan for the immediate expansion of Oblivion Forge's internal cargo storage capabilities. Current logistical analyses indicate that existing capacity is nearing critical limits, impacting both incoming resource flow and outgoing product distribution. This expansion project aims to mitigate these limitations by integrating new, modular cargo hold sections, thereby significantly increasing storage volume and improving handling efficiency.

Project Rationale and Objectives

  • Growing Demand: Oblivion Forge's expanding research and development efforts, coupled with increasing raw material acquisitions (e.g., Azurite Gas, Xeno Relics) and a rising volume of specialised product exports, have placed immense strain on current storage infrastructure.
  • Operational Bottlenecks: Insufficient storage capacity leads to delays in offloading incoming shipments, inefficient internal cargo transfers, and potential bottlenecks in the manufacturing pipeline due to constrained buffer space.
  • Future-Proofing: Proactive expansion is necessary to accommodate anticipated growth in both material intake and finished goods output, ensuring Oblivion Forge can scale operations without logistical impediments.
The primary objectives of this project are:
  • To increase total cargo storage volume by 30.000 units.
  • To enhance cargo flow efficiency through optimised module layout and improved automated transfer systems.
  • To provide dedicated, climate-controlled or shielded sections for sensitive and exotic materials.
  • To minimise disruption to ongoing station operations during construction and integration.

Project Scope and Methodology


The expansion project will involve the construction and integration of a new, purpose-built cargo module. This module will be designed for seamless attachment to the existing primary cargo bay structure, utilising reinforced magnetic docking clamps and universal utility conduits.

Phase 1: Design and Fabrication

  • Finalisation of structural blueprints.
  • Pre-fabrication of key structural components, internal bracing, and external plating.
  • Assembly of internal shelving, automated crane systems, and environmental controls within the module.

Phase 2: Site Preparation and Docking

  • Preparation of the designated docking port on the existing station structure.
  • Reinforcement of the connection point to support the additional mass and stress of the new module.
  • Alignment and manoeuvring of the pre-fabricated cargo module for docking.

Phase 3: Integration and Systems Check

  • Secure structural coupling.
  • Connection of life support, power, data, and environmental control systems.
  • Calibration and testing of automated cargo handling systems within the new module.
  • Integration of new module into the station's central logistics network and inventory management system.

Phase 4: Operational Readiness

  • Final stress tests and integrity checks.
  • Simulated cargo transfers and system diagnostics.

Expected Benefits

  • Increased Capacity: Direct resolution of storage limitations, allowing for greater material stockpiles and finished product warehousing.
  • Improved Efficiency:Reduced docking times for supply vessels, faster internal transfers, and less manual handling.
  • Enhanced Security: Modernised storage systems offer improved tracking, environmental control, and potentially enhanced shielding for sensitive goods.
  • Operational Flexibility: Provides buffer capacity to absorb spikes in demand or supply, minimising disruptions to manufacturing schedules.

Material Requirements


The following is a list of materials and their approximate quantities required for the construction and integration:
  • Hull Panels 10.000 units
  • Industrial Materials 5.000 units
  • Robotics 5.000 units
  • Construction Machinery 5.000 units
  • Optronics 5.000 units
Reply  


Messages In This Thread
Oblivion Forge | Station Projects - by Oblivion Forge - 06-02-2025, 12:24 PM
RE: Oblivion Forge | Station Projects - by Oblivion Forge - 06-03-2025, 07:06 PM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2025 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode