• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Unofficial Factions and Groups
« Previous 1 … 88 89 90 91 92 … 388 Next »
EFL| Oil & Machinery | Rheinland Connection Initiative | Reporting Facility

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Pages (3): « Previous 1 2 3 Next »
EFL| Oil & Machinery | Rheinland Connection Initiative | Reporting Facility
Offline Hopewell
03-12-2019, 11:43 PM, (This post was last modified: 03-12-2019, 11:46 PM by Hopewell.)
#11
Member
Posts: 831
Threads: 30
Joined: Apr 2016

[Image: EFLBanner2.png]

Incoming .... open ... .. .


Ship name: EFL|Mont.Blanc
Date: 12/03/826 AS
Cargo report: 1000 unt Gate/Lane Parts
Flight report: In order to continue the progress in building the site in Frankfurt, today I was able to do one more flight to and from the airport. I had a flight buddy, the captain of ship EFL|Batillus, although he always had two systems in front of me. This was no problem, because it is always good to know that if there is a problem, we can count on a friend. The flight from Picardy to Frankfurt passed normally. No problems. Other deliveries will.
Graciously:

Cap. Michel Le Gall


End .. signal .. lost ...

[Image: oNY8Aac.png]
Reply  
Offline Vulkhard Muller
03-13-2019, 03:22 AM,
#12
20yrs & I Only Got This Title
Posts: 2,365
Threads: 422
Joined: Feb 2012

[Image: IjoFpIa.png]



Ship and Pilot name: EFL|Batillus; Ludovic Fabron
Cargo report: Delivery report
Flight report: Very Quiet, as reported by Cap. Le Gall we had a rather uneventful trip. Bumped into a Freelancer in Cologne before departing for the border. Other then that nothing of note.




[Image: oNY8Aac.png]


Sent me a Comm? Haven't received a reply in a reasonable time span? Sorry! Post here and I'll get back to you asap!
Reply  
Offline Hopewell
03-14-2019, 09:26 PM,
#13
Member
Posts: 831
Threads: 30
Joined: Apr 2016

[Image: HaTOL4Z.png]

Ship and Pilot name: Krüger|KMS-Ruhr / Karl Mecker
Date: 14/03/826 AS
Cargo report: Link to Screenshot
Flight report: The flight to Picardy happened without problems.
I went, bought Gate / Lane Parts, came back and delivered that load at the Sigma 15 Gate Construction Site in Frankfurt.
Graciously:
Karl Mecker


[Image: kruger-tb-btm.png]
Reply  
Offline kerfy
03-20-2019, 03:19 AM, (This post was last modified: 03-21-2019, 04:33 AM by kerfy.)
#14
Imperial Provisioner
Posts: 194
Threads: 5
Joined: Jul 2017

[Image: HaTOL4Z.png]
Ship and Pilot name: (Kruger|KMS-Erfurt;Kaiser Kramer)
Date: 19/03/826 AS
Cargo report: 1000 unts Trade Lane/Gate Parts Copy of Cargo Manifest
(Optional)Flight report: (The Flight was uneventfull, A nice change i itself.. Looking forward to providing more assistance.)


[Image: kruger-tb-btm.png]
Reply  
Offline Hopewell
03-27-2019, 05:34 PM,
#15
Member
Posts: 831
Threads: 30
Joined: Apr 2016

[Image: EFLBanner2.png]

Incoming .... open ... .. .


Ship name: EFL|Mont.Blanc
Date: 27/03/826 AS
Cargo report: 1000 unt Gate/Lane Parts
Flight report: In order to make great progress in building the Site in Frankfurt, since I began to cooperate for the adequate supply of Picardy. This is another delivery I deliver. The flight from there to Frankfurt was normal. There was a problem with the return from Zurich to Frankfourt. A pirate named Shadowfly assaulted me and destroyed my ship, leaving me with all the crew waiting for ransom, which happened shortly by the EFL team. I repaired the damage of the ship and practically rebuilt it, directed the crew to follow the destination by another route, according to the nautical chart, as follows: Picardy / Orléans / Ile de France / Burgund / Lorraine / Tau 53 / Hokkaido / New Tokyo / Honshu / Sigma 21 / Sigma 15 / Frankfurt.
Thus, despite this incident, delivery was made. Others will come.
[+]Proof of incidente
Secreen.
Graciously:

Cap. Michel Le Gall


End .. signal .. lost ...

[Image: oNY8Aac.png]
Reply  
Offline Hopewell
03-27-2019, 07:39 PM, (This post was last modified: 03-27-2019, 07:40 PM by Hopewell.)
#16
Member
Posts: 831
Threads: 30
Joined: Apr 2016

[Image: HaTOL4Z.png]

Ship and Pilot name: Krüger|KMS-Ruhr / Karl Mecker
Date: 27/03/826 AS
Cargo report: Link to Screenshot
Flight report: There was a problem coming back from Zurich. In Frankfurt a pirate named Alyssa.Guzman assaulted me and charged me 2,000,000 for his cause. No more events.
Thus, despite this incident, delivery was made.
I went, bought Gate / Lane Parts, came back and delivered that load at the Sigma 15 Gate Construction Site in Frankfurt.

Graciously:
Karl Mecker


[Image: kruger-tb-btm.png]
Reply  
Offline Thyrzul
04-13-2019, 02:16 PM,
#17
The Council
Posts: 4,684
Threads: 115
Joined: Sep 2011

[Image: nP2AFtq.png]
Ship and Pilot name:
Cargo report:
Flight report:
EFL Boismont; Jules Tailleferre
74204001.img 74204002.img 74204003.img 74204004.img




I'm glad to be back in business after months of hiatus. The EFL Boismont has successfully delivered 800 units of Jump Gate equipment to the Sigma-15 Gate Construction Site.

[Image: OFPpYpb.png][Image: N1Zf8K4.png][Image: LnLbhul.png]
Reply  
Offline Thyrzul
04-14-2019, 03:40 PM, (This post was last modified: 04-14-2019, 03:56 PM by Thyrzul.)
#18
The Council
Posts: 4,684
Threads: 115
Joined: Sep 2011

[Image: nP2AFtq.png]
Ship and Pilot name:
Cargo report:
Flight report:
EFL Boismont; Jules Tailleferre
74204005.img 74204006.img 74204007.img 74204008.img




The way to the site went uneventful. The EFL Boismont has successfully delivered 800 units of Jump Gate equipment to the Sigma-15 Gate Construction Site. On the way back, however, I've got intercepted by a Corsair and two rebels with the callsign prefix "UN|". A considerable amount of funds were lost to save the ship, the crew and the full load of industrial materials we were bringing on the way back. I advise contacting the authorities of both nations about the alarmingly high amount of outlaws roaming the trade routes. Next time they could even endanger the gate construction project itself.

[Image: OFPpYpb.png][Image: N1Zf8K4.png][Image: LnLbhul.png]
Reply  
Offline Hopewell
04-17-2019, 01:46 PM, (This post was last modified: 04-17-2019, 01:48 PM by Hopewell.)
#19
Member
Posts: 831
Threads: 30
Joined: Apr 2016

[Image: EFLBanner2.png]

Incoming .... open ... .. .


Ship name: EFL|Mont.Blanc
Date: 17/04/826 AS
Cargo report: 1000 unt Gate/Lane Parts
Flight report: In order to make a major progress in the construction of the Site in Frankfurt I started cooperation for the proper supply from Picardy. Others shipment will come.
Graciously:

Cap. Michel Le Gall


End .. signal .. lost ...

[Image: oNY8Aac.png]
Reply  
Offline Hopewell
04-17-2019, 03:06 PM,
#20
Member
Posts: 831
Threads: 30
Joined: Apr 2016

[Image: HaTOL4Z.png]

Ship and Pilot name: Krüger|KMS-Ruhr / Karl Mecker
Date: 17/04/826 AS
Cargo report: Link to Screenshot
Flight report: The flight to Picardy happened without problems.
I went, bought Gate / Lane Parts, came back and delivered that load at the Sigma 15 Gate Construction Site in Frankfurt.
Graciously:
Karl Mecker


[Image: kruger-tb-btm.png]
Reply  
Pages (3): « Previous 1 2 3 Next »


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode