• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Interactive DarkMap
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Unofficial Factions and Groups
« Previous 1 … 160 161 162 163 164 … 394 Next »
DISP Deliveries Optronic Arrays 041023

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

DISP Deliveries Optronic Arrays 041023
Offline Deep Space Engineering
10-04-2016, 05:21 PM, (This post was last modified: 10-04-2016, 05:23 PM by Deep Space Engineering.)
#1
Member
Posts: 721
Threads: 182
Joined: Mar 2011

[Image: CvyMCae.png]

Consignment receipts will not be accepted if they are not time stamped.

Only delivery proof is required.

[Image: DSE_copy.png]
. About us . Chesterfield Station . Recruitment . Wiki page .
  Reply  
Offline Neptune
10-07-2016, 06:26 PM,
#2
Moderator | DHC-
Posts: 417
Threads: 10
Joined: Nov 2015

[Image: 20110920060754%21USI_Logo.png]
Name: Neal Carson
Ship name: [*USI*]Lethbridge[E]
Commodity: Optronic Arrays
Amount Shipped: 4000
Shipping date of requested materials imported[screen shot/time stamp]: OA#01-823-10-05 | 21:22:26 SMT

Brief Summary (optional): We began the shipping process as soon as we received the assignment from HQ. Captains of Columbia, Pickens and myself made our trip from Liberty to Kusari space with no trouble, however, on our way back a Lane Hacker bearing the call sign Fixer disrupted the lane between Planet Junyo and Deshima Station. We managed to hold off the Hacker until a member of the KSP showed up to deal with him, at which point we resumed our trip back to DISP. Once, arrived, it appeared due to an administrative issue, we could not unload our cargo. This issue has since been resolved and the first load is being unloaded as we speak.


[Image: qcAwCM9.png]
Reply  
Offline Neptune
10-08-2016, 02:53 PM,
#3
Moderator | DHC-
Posts: 417
Threads: 10
Joined: Nov 2015

[Image: 20110920060754%21USI_Logo.png]
Name: Neal Carson
Ship name: [*USI*]Lethbridge[E]
Commodity: Optronic Arrays
Amount Shipped: 4000
Shipping date of requested materials imported[screen shot/time stamp]: OA#02-823-10-08 | 13:43:36 SMT

Brief Summary (optional): Another 4000 units were delivered. Nothing noteworthy to report on this trip.


[Image: qcAwCM9.png]
Reply  
Offline Fish
10-11-2016, 09:58 PM,
#4
Member
Posts: 833
Threads: 118
Joined: Nov 2015

[Image: 20110920060754%21USI_Logo.png]
Name: Andrew Walter
Ship name: [*USI*]Salt.Lake[E]
Commodity: Optronic Arrays
Amount Shipped: 3770
Shipping date of requested materials imported[screen shot/time stamp]: OA#03-823-10-10 | 18:55:26 SMT

Brief Summary (optional): 3,770 units delivered to DISP.


[Image: qcAwCM9.png]
Reply  
Offline Neptune
10-14-2016, 09:30 PM,
#5
Moderator | DHC-
Posts: 417
Threads: 10
Joined: Nov 2015

[Image: 20110920060754%21USI_Logo.png]
Name: Neal Carson
Ship name: [*USI*]Lethbridge[E]
Commodity: Optronic Arrays
Amount Shipped: 3400
Shipping date of requested materials imported[screen shot/time stamp]: OA#04-823-10-10 | 19:29:18 SMT

Brief Summary (optional): This one was completed a few days ago. Apologies for the late submission.


[Image: qcAwCM9.png]
Reply  


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode