• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Unofficial Factions and Groups
« Previous 1 … 81 82 83 84 85 … 391 Next »
Projekt: Regensburg | Reporting Terminal

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Pages (2): 1 2 Next »
Projekt: Regensburg | Reporting Terminal
Offline Bannorn
07-04-2019, 05:24 AM, (This post was last modified: 08-04-2019, 06:00 AM by Bannorn.)
#1
DHC-
Posts: 619
Threads: 59
Joined: Dec 2018

[Image: ojZAaoh.png]


『Source: < E. Mannlicher | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Daumann Heavy Construction | Rheinex | Republican Shipping




Guten Tag Kollegen und Kolleginnen,

As part of the Grossbauplan 826, it is time to address the repeated requests by the Erzbetrieb Ore Mining Services of our big family, and a substantial expansion of the facilities at Regensburg Station is called for.

The aim of the project is to provide an expansion of approximately 200,000 metric Standard Units of processing and Storage space for the thriving Aluminium Ore trade; this upgrade has been necessitated by the heavy demand for the Ore in multiple House markets. Resultantly, storage capacity has been the major bottleneck during Mining Operations.

Expansion of the station will be achieved in four (4) phases, each necessitating different engineering and shipment requirements. They are detailed below im the Project Plan. In order to allow the smooth continuation of trade operations during the construction period, all effort should be taken to maximise speed of delivery; delivery and shipment payments have been set appropriately high to compensate captains for their on and off-duty efforts. Furthermore, the station's normally largely automated facilities will be supported by the deployment of an Engineering crew to oversee construction and shipping operations.

A delivery summary of the current phase is provided below, please see each Phase description for the current status of deliveries. Shipments should be logged according to the Shipping Division Template.




Regensburg Expansion

Project Summary
Under Construction
Project Phase: Phase II
[Regensburg Information Access]




『Current Shipment Requirements

CommodityIconUnit Price
[Image: Commod_waterice.jpg]Water500
[Image: Oxygen.jpg]Oxygen500
[Image: Synthpaste.jpg]Food500
[Image: ReinforcedAlloy.jpg]Reinforced Alloy750




[align=center]Project Phase Plan

Phase I: Deconstruction of Defense module.
In order to permit the development schedule going forward, the 4th defensive installation has been decomissioned and deconstructed for redeployment at a later date.





Phase II: Construction of Expansion Modules.
The requirement for multiple cargo storage areas intended for bulk storage will necessitate a major expansion of the station's structural frame and outer primary hulls. This will be the aim of Phase II, building a two part expansion to the facility along with expanded support systems and solar arrays.
[+]Phase II Delivery Requirements
CommodityQuantityDeliveredStatus
Hull Segments40,00040,000COMPLETE
Industrial Hardware100,000100,000COMPLETE
Robotic Hardware40,00040,000COMPLETE
Reinforced Alloy40,00040,000COMPLETE
High Performance Alloy40,00040,000COMPLETE
Optronic Arrays40,00040,000COMPLETE
Heat Sinks40,00040,000COMPLETE
Plasfoam Conduits20,00020,000COMPLETE
Nanomembrane Filters20,00020,000COMPLETE




Phase III: Construction of three (3) primary bulk-storage bays.
The primary objective of the projekt is the construction of three (3) Storage bays intended for bulk storage of Aluminium Ore. This will be achieved through the construction of 3 inter-connecting bulk-storage bays in the newly expanded station areas, connected via automated loading systems to existing storage modules. This phase will include the necessary expansion to docking bays loading and unloading facilities.
[+]Phase III Delivery Requirements
CommodityQuantityDeliveredStatus
Hull Segments120,00045,000COMPLETE
Industrial Hardware30,00030,000COMPLETE
Robotic Hardware15,00015,000COMPLETE




Phase IV: Reconstruction of Facilities.
As part of this plans outline, deconstruction of existing defensive facilities is foreseen. Therefore, Phase IV is intended to provide the option for this installation's reconstruction. A Review will take place prior to Phase IV, to determine whether further expansion should be considered, or whether the defensive installation can be rebuilt. Further information will be provided at the end of the review.
[+]Phase IV Delivery Requirements
CommodityQuantityDeliveredStatus
Hull Segments40,0000,000On Hold
Industrial Hardware10,0000,000On Hold
Robotic Hardware5,0000,000On Hold


All Erzbetrieb Transport and Logistik Flotte Captains should begin immediate shipments, and report via this neural net channel all deliveries, according to the template provided below:


『Shipping Division Template

Code:
[align=center][img]https://i.imgur.com/eWpstjj.png[/img][/align]

[align=left][color=#2E8B57][font=Lucida Sans Unicode]
『[b]Source:[/b] Kapitän Firstname Lastname |  Daumann Heavy Construction >
『[b]Relay:[/b] The Ring, Main Relay
『[b]Encryption:[/b] AgeiraSec II
『[b]Access:[/b] Daumann Heavy Construction
『[b]Message Type:[/b] Regensburg Delivery Reports
[/color][/font][/align]
[hr]
[align=left][color=#2E8B57][font=Lucida Sans Unicode]
『[b]Convoy Participants:[/b]
- <Shipname>

『[b]Notizen des Kapitän:[/b]
<Write the rest of your report here.>


[hr]

[Spoiler=Delivery Report][table]
[tr][td]Commodity[/td][td]Quantity[/td][/tr]
[tr][td]XXXXXXX[/td][td]XXXX[/td][/tr]
[/table][/spoiler]

[spoiler=Delivery Manifest]
[imgw]XXXX[/imgw]
[imgw]XXXX[/imgw]
[imgw]XXXX[/imgw]
[/spoiler]

[hr]


『<Kapitän Firstname Lastname>
『[font=segoe script]Firstname Lastname[/font]
『Daumann Heavy Construction
『Shipping Division
[/align][/color][/font]


I wish you all safe skies and happy shipping!

『Erwin Mannlicher
『E. Mannlicher
『Daumann Heavy Construction
『Betriebsleiter

[Image: hZ0WkLg.png]

(06-12-2019, 01:04 AM)Nepotu Wrote: Remove the SNAC for good
Quote:[08.07.2019 03:20:17] =CR=Zulu: Situations like these makes me wish they left me behind in Crayter.
Reply  
Offline Bannorn
07-04-2019, 06:28 AM,
#2
DHC-
Posts: 619
Threads: 59
Joined: Dec 2018

[Image: ojZAaoh.png]


『Source: < E. Mannlicher | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Daumann Heavy Construction
『Message Type: Regensburg Delivery Reports



『Convoy Participants:
- DHC-Duppel
- DHC-Steyr
- DHC-Unstrut
- DHC-Weser
- <RS>|RTS-Lichtenfels
- <RS>|RTS-Neuruppin
- <RS>|RTS-Saaletaal

『Notizen des Kapitän:
< No noteworthy incidents to report. All convoy transits proceeded smoothly, and unloading was managed in rapid order. >




[+]Delivery Report
CommodityQuantity
Heat Sinks2,500
High Performance Alloys2,500
Reinforced Alloy20,000
PlasFoam Conduits5,000
Optronic Arrays5,000
Nanomembrane Filters5,000
Robotic Hardware20,000
Industrial Hardware5,000
[+]Delivery Manifest














『Erwin Mannlicher
『E. Mannlicher
『Daumann Heavy Construction
『Betriebsleiter

[Image: hZ0WkLg.png]

(06-12-2019, 01:04 AM)Nepotu Wrote: Remove the SNAC for good
Quote:[08.07.2019 03:20:17] =CR=Zulu: Situations like these makes me wish they left me behind in Crayter.
Reply  
Offline Deni
07-07-2019, 08:07 AM,
#3
Member
Posts: 20
Threads: 0
Joined: Feb 2019

[Image: eWpstjj.png]


『Source: < Uwe Schultz | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Daumann Heavy Construction
『Message Type: Alexanderwerft Delivery Report


『Convoy Participants:
- DHC-Stettin
- DHC-Starnberg
- <RS>RTS-Schwabach




[+]Delivery Report

CommodityQuantity
High Performance Alloy20,000
Hull Segments5,000
[+]Delivery Manifest
[Image: screen1.png]
[Image: screen2.png]
[Image: screen3.png]
[Image: screen4.png]
1 Hull Segments and 1 High Performance Alloy is missing forget to document



『<Uwe Schultz>
『U. Schultz
『Daumann Heavy Construction
『Kapitän

Wir. Dienen. Rheinland
Reply  
Offline RandomJellys
07-13-2019, 02:29 AM, (This post was last modified: 07-13-2019, 02:33 AM by RandomJellys.)
#4
Member
Posts: 19
Threads: 2
Joined: Aug 2015

Greetings i have Delivered.

30,000 Reinforced Alloy From Freeport 8 in sigma 15
95,000 Industrial Hardware From Augsuburg wreck in Munich

Screenshots can be found here https://imgur.com/a/zk66ul4

To your station

R.Jelly
Reply  
Offline RandomJellys
07-13-2019, 03:15 PM, (This post was last modified: 07-13-2019, 03:19 PM by RandomJellys.)
#5
Member
Posts: 19
Threads: 2
Joined: Aug 2015

Greetings i have Delivered.

5000 High Performance Alloy From Kensington Shipyard From the New London System
10000 Heat sinks from Planet New London from the New London System
13000 Robotic Hardware From Aland Shipyard from the Omega 3 System

Screenshots can be found here https://imgur.com/a/DLbRHpF

2 Other Traders have Helped

Houg2 Delivered 2940 Robotics Hardware
Clave Delivered 5000 Heatsinks

To your station

From Both Delivery's this make the following orders completed for the Phase 2
Industrial Hardware
Robotic hardware
Reinforced Alloy
High Performance Alloy
Heatsinks

Sincerely
R.Jelly
Reply  
Offline Bannorn
07-15-2019, 06:43 AM,
#6
DHC-
Posts: 619
Threads: 59
Joined: Dec 2018

[Image: ojZAaoh.png]


『Source: < E. Mannlicher | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Daumann Heavy Construction
『Message Type: Regensburg Delivery Reports



『Convoy Participants:
- DHC-Wesel

『Notizen des Kapitän:
< No noteworthy incidents to report. All convoy transits proceeded smoothly, and unloading was managed in rapid order. >




[+]Delivery Report
CommodityQuantity
Hull Segments21,900
Plasfoam Conduits15,000
Optronic Arrays20,000
Nanomembrane Filters800
[+]Delivery Manifest
















『Erwin Mannlicher
『E. Mannlicher
『Daumann Heavy Construction
『Betriebsleiter

[Image: hZ0WkLg.png]

(06-12-2019, 01:04 AM)Nepotu Wrote: Remove the SNAC for good
Quote:[08.07.2019 03:20:17] =CR=Zulu: Situations like these makes me wish they left me behind in Crayter.
Reply  
Offline Reacher
07-17-2019, 05:01 AM,
#7
Member
Posts: 893
Threads: 39
Joined: Oct 2009

[Image: ojZAaoh.png]


『Source: < J. Krieger | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Daumann Heavy Construction
『Message Type: Regensburg Delivery Reports



『Convoy Participants:
- DHC-DTS-Darmstadt

『Notizen des Kapitän:
< No noteworthy incidents to report. All convoy transits proceeded smoothly, and unloading was managed in rapid order. >




[+]Delivery Report

CommodityQuantity
Head Sink9910
[+]Delivery Manifest
Heat Sink 4965 -1
Heat Sink 4965 -2


『Jim Kreiger
『J. Krieger
『Daumann Heavy Construction
『Betriebsleiter
  Reply  
Offline Bannorn
07-25-2019, 05:34 AM,
#8
DHC-
Posts: 619
Threads: 59
Joined: Dec 2018

[Image: ojZAaoh.png]


『Source: < E. Mannlicher | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Daumann Heavy Construction
『Message Type: Regensburg Delivery Reports



『Convoy Participants:
- DHC-Wesel

『Notizen des Kapitän:
< No noteworthy incidents to report. All convoy transits proceeded smoothly, and unloading was managed in rapid order. >




[+]Delivery Report
CommodityQuantity
Hull Segments5,000
Crew600
Robotic Hardware20,000
Industrial Hardware23,000
[+]Delivery Manifest






『Erwin Mannlicher
『E. Mannlicher
『Daumann Heavy Construction
『Betriebsleiter

[Image: hZ0WkLg.png]

(06-12-2019, 01:04 AM)Nepotu Wrote: Remove the SNAC for good
Quote:[08.07.2019 03:20:17] =CR=Zulu: Situations like these makes me wish they left me behind in Crayter.
Reply  
Offline Bannorn
07-27-2019, 05:57 AM,
#9
DHC-
Posts: 619
Threads: 59
Joined: Dec 2018

[Image: ojZAaoh.png]


『Source: < E. Mannlicher | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Daumann Heavy Construction
『Message Type: Regensburg Delivery Reports



『Convoy Participants:
- DHC-Wesel

『Notizen des Kapitän:
< No noteworthy incidents to report. All convoy transits proceeded smoothly, and unloading was managed in rapid order. >




[+]Delivery Report
CommodityQuantity
Hull Segments30,000
Reinforced Alloys5,000
[+]Delivery Manifest














『Erwin Mannlicher
『E. Mannlicher
『Daumann Heavy Construction
『Betriebsleiter

[Image: hZ0WkLg.png]

(06-12-2019, 01:04 AM)Nepotu Wrote: Remove the SNAC for good
Quote:[08.07.2019 03:20:17] =CR=Zulu: Situations like these makes me wish they left me behind in Crayter.
Reply  
Offline Bannorn
07-30-2019, 05:06 AM,
#10
DHC-
Posts: 619
Threads: 59
Joined: Dec 2018

[Image: ojZAaoh.png]


『Source: < E. Mannlicher | Daumann Heavy Construction >
『Relay: The Ring, Main Relay
『Encryption: AgeiraSec II
『Access: Daumann Heavy Construction
『Message Type: Regensburg Delivery Reports



『Convoy Participants:
- DHC-Wesel

『Notizen des Kapitän:
< No noteworthy incidents to report. All convoy transits proceeded smoothly, and unloading was managed in rapid order. >




[+]Delivery Report
CommodityQuantity
Hull Segments40,000
Reinforced Alloys5,000
Food5,000
Water5,000
Oxygen5,000
[+]Delivery Manifest





















『Erwin Mannlicher
『E. Mannlicher
『Daumann Heavy Construction
『Betriebsleiter

[Image: hZ0WkLg.png]

(06-12-2019, 01:04 AM)Nepotu Wrote: Remove the SNAC for good
Quote:[08.07.2019 03:20:17] =CR=Zulu: Situations like these makes me wish they left me behind in Crayter.
Reply  
Pages (2): 1 2 Next »


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode