• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Official Player Factions Kusari GC- Kinkaku-ji Kinkaku-ji Construction Phase Three

Server Time (24h)

Players Online

Active Events - Scoreboard
Corsair Kills - 1 / 1,000
Lawful Kills - 23 / 1,000
Red Hessian Kills - 1 / 1,000
Unlawful Kills - 19 / 1,000

Latest activity

Kinkaku-ji Construction Phase Three
Offline The Gen'an Chrysanthemums
03-11-2020, 11:34 PM, (This post was last modified: 04-26-2020, 08:22 PM by The Gen'an Chrysanthemums.)
#1
Member
Posts: 282
Threads: 63
Joined: Dec 2017

Golden Chrysanthemum
Gen'an Cell

[Image: iHaHiX2.png]


Kinkaku-ji

Construction Phase Three: Reactor Upgrade & Gunboat Construction Facility


With the new introduction of the Iris Very Heavy Fighter, we are looking towards modernisation of our entire arsenal. This will include a gunboat class vessel of our own. We have therefore contacted the Maltese Imperial coalition to supply us with the hardware to construct such shipclasses. The design itself will have to occur at a later time. Seeing as we need a place to assemble the gunboat, we will have to construct a suitable drydock next to Kinkaku-ji. This will also make the minor repairs on our tridentes more efficient. Since we have no blueprints or experience designing a drydock, we need to find someone who will aid in its construction at a later date.

Lastly, the expansions of the Shrine station is pushing our reactor to its limits. It was designed to supply power to a medium size station. Therefore, an upgrade to the reactor is neccesary. Right now, we do everything to save power, so the station is not performing at optimal capacity.


Project Status Channel
Reactor upgrade Completed N/A
Gunboat Construction Machinery and Hardware Completed Link



Information - Recruitment - Feedback - Database - Comm Network - Personnel Files - Faction Diplomacy
Reply  
Offline The Gen'an Chrysanthemums
04-26-2020, 08:36 PM,
#2
Member
Posts: 282
Threads: 63
Joined: Dec 2017

Golden Chrysanthemum
Gen'an Cell

[Image: iHaHiX2.png]


Kinkaku-ji

Construction Phase Three: Completion


The gunboat construction hardware has been supplied by the Maltese Imperial coalition and was installed in the factory sector of Kinkakuji.

The H-Fuel station reactor has been upgraded to support our higher energy demand using the recommendantions and support of the Natio Octavium. They have also supplied the Utralloy neccesary to construct our improved reactor. The High Performance Alloy and the Critical Temperature Alloy has been supplied by Gen'an transport vessels. The reactor is up and running again and it will meet our energy demands in the forseeable future.

Below are the status reports of the Reactor upgrade.


Material Status Channel
Ultralloy 15,000/15,000 Link
High Performance Alloy 10,000/10,000 Link
Critical Temperature Alloy 10,000/10,000 Link



Information - Recruitment - Feedback - Database - Comm Network - Personnel Files - Faction Diplomacy
Reply  


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode