Thank you for your continued interest in our services. I have instructed the planning department to re-evaluate the prices now that some routes and procurement stations have altered. We will send you a new price quote shortly.
Below you will find the updated price quote for this project. Because of the size of the project as well as your continued interest in OSI we've lowered the project advance (i.e. down-payment) to a mere ten percent.
Project Comercio Fantasma:
The project includes the purchase and delivery of materials and installation of two hexagonal solar panels, enhancement of the reactor to a type 5H and upgrade battery and electrical systems. Upon completion OSI will assemble two bio-domes as per customer request. Both bio-domes are already available on-site.
Materials prices:
Item
Unit Cost
On-site payout
Total Cost
22,000 Solar Panels
290
261
6,380,000
30,000 Industrial Materials
320
288
9,600,000
20,000 Nanocapacitors
290
261
5,800,000
13,000 Superconductors
360
324
4,680,000
2,500 Nanotubes
260
234
650,000
The prices listed above include both transportation and on-site construction. OSI pilots will confirm each delivery in this message channel. By accepting this contract, you agree to pay the total amount minus the 10% for each delivered item directly to the OSI pilot reporting the delivery. This price displayed in the third column labeled 'On-site payout'. Payments made to our pilots can be reduced by any amounts already paid directly at the time of delivery.
By accepting this contract, OSI requires a 10% advance prior to start of both the shipping and the construction. This advance (2.711.000 SC) can be paid to OSI-Bank.Deposits. You further agree that the advance will not be returned on cancellation as it covers OSI’s operational losses and preparation costs associated with fulfilling the contract as well as the survey fee.
Once you confirm, OSI planners will arrange for the transports and construction crews to begin. Please be advised that certain construction phases require the work area to be fully ventilated, free of any traces of cardamine. The construction crew chief will coordinate with your station manager throughout the project to identify specific areas that will need ventilation.
I will keep you updated on progress, and please feel free to reach out with any additional inquiries.
Thankyou for coming back to me and indeed looking at amending prices.
I want to go ahead and still truly believe you and your team are the correct ones for the job, however I also feel the pricing is still rather too high for the commodities required.
Thank you also for taking into consideration we also produce our own Niobium.
What can be done on price, senor?
If it can become more friendly to the pocket, I'll push the button immediately.
As per your request we have adjusted the prices and lowered them with 20 percent. Please be aware that these prices include shipping, construction and installation as well as fuel and personel costs. We cannot lower them any further.
Below you will find the updated price quote for this project. The project advance (i.e. down-payment) remains ten percent.
Project Comercio Fantasma:
The project includes the purchase and delivery of materials and installation of two hexagonal solar panels, enhancement of the reactor to a type 5H and upgrade battery and electrical systems. Upon completion OSI will assemble two bio-domes as per customer request. Both bio-domes are already available on-site.
Materials prices:
Item
Unit Cost
On-site payout
Total Cost
22,000 Solar Panels
232
209
5,104,000
30,000 Industrial Materials
256
230
7,680,000
20,000 Nanocapacitors
232
200
4,640,000
13,000 Superconductors
288
259
3,744,000
2,500 Nanotubes
208
187
520,000
As mentioned, the prices listed above include both transportation and on-site construction and other operational costs OSI makes. OSI pilots will confirm each delivery in this message channel. By accepting this contract, you agree to pay the total amount minus the 10% for each delivered item directly to the OSI pilot reporting the delivery. This price displayed in the third column labeled 'On-site payout'. Payments made to our pilots can be reduced by any amounts already paid directly at the time of delivery.
By accepting this contract, OSI requires a 10% advance prior to start of both the shipping and the construction. This advance (2.168.800 SC) can be paid to OSI-Bank.Deposits. You further agree that the advance will not be returned on cancellation as it covers OSI’s operational losses and preparation costs associated with fulfilling the contract as well as the survey fee.
Once you confirm, OSI planners will arrange for the transports and construction crews to begin. Please be advised that certain construction phases require the work area to be fully ventilated, free of any traces of cardamine. The construction crew chief will coordinate with your station manager throughout the project to identify specific areas that will need ventilation.
I will keep you updated on progress, and please feel free to reach out with any additional inquiries.
Thank your for your acceptance of the contract. I will notify our planning department today. Please inform your loadmasters to expect incoming shipments soon. Our pilots will report their deliveries in this very same channel. Once all deliveries of a commodity are made you are kindly requested to ensure that each pilot is paid accordingly if not already done on the station.
I once again wish to inform you that work areas are to be fully ventilated, free of any traces of cardamine. The construction crew chief will coordinate with your station manager throughout the project to identify specific areas that will need ventilation.