• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Official Player Factions Kusari [KNF]
1 2 Next »
Project A-200

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

Project A-200
Offline Darius
11-15-2021, 06:40 PM, (This post was last modified: 06-18-2024, 10:24 AM by Darius.)
#1
The Lion of Bretonia
Posts: 1,407
Threads: 303
Joined: Aug 2020

Kusari Naval Forces

[Image: bM9dE4l.png]

Transmission received
Code recognised as A-230-951-KUCOM
Decrypting....


Project A-200
"Yashima"-class Tokugawa
Status: Completed / Phase III


No outside parties will be made aware of the plans or construction. Workers will sign an agreement that prevents them from revealing information about the warship to outsiders.

Design Schematics for the A-200 Project


Primary design characteristics:

The main reasoning behind the development of this project is the arrival of new classes of battleships onto the combat field, therefore reinforcing the need of further weapon tests to remain a dominant power on the modern battlefield. During the invasion of Gallia, the lack of long-range weaponry has proven fatal to our plans, making us rely on tactics of kamikaze attacks in the majority of large battles. The tested and succesful "Hammer and Anvil" tactics employed by the Hamamatsu and Matsumoto in Lorraine and Burgundy respectively have showed that in modern capital ship battles, artillery decides the winner.

Project A-200 is aimed at the research and, in the future, production of armament that will fit the need of the Kusari Naval Forces for a weapon that is up-to-date in all engagements with hostile forces. The main focus is on the RA-20 "Taisho" batteries, which are designed from the previous models of the RA-20 "Gale" batteries. The "Taisho"-class artillery, however, requires additional testing before being made operational. Other important parts of the project are the larger crew cabins, new range finders and improved hangar bays for the snubcraft escorting the warship.

The project also aims at producing a new class of Tokugawa warship that will mount the previously-mentioned armament, alongside a reinforced hull and emplying the latest technology available to the Naval Forces. Both the armament and the hull will be prototypes containing Azurite Gas, the key to Hybrid weaponry. This will be acquired through our contacts in The Core.

If successful, Project A-200 will provide the Naval Forces the ability to launch larger offensive actions in capital ship warfare. The new doctrine of Decisive Battle, made after the war with Rheinland and with the arrival of the "Showa"-class Hamamatsu, will play well in our favor with such a design available.

Development phases:

  • Phase I: Acquiring materials needed for the construction of armament and hull reinforcements.
    During Phase I of the project, Kusari corporations and The Core will be contacted about the project's required materials and asked if they wish to assist. Due to the nature of the project, no further details will be provided to maintain absolute secrecy. The destination of goods will be Yukawa Shipyard, from which they will be carried onto Kure Shipyard for assembly.
    [+]Required materials
    RA-20 "Taisho" requirements:
    Azurite Gas: 5,000
    Nanocapacitors: 5,000
    Quantum Multiplexors: 10,000
    Nanotubes: 10,000

    "Yashima"-class hull prototype requirements:
    Azurite Gas: 10,000
    Ablative Armor Plating: 20,000
    Industrial Materials: 10,000
  • Phase II: Assembly
    The assembly part is estimated at several weeks, however the period can be reduced by increasing the amount of workers at the shipyard.
  • Phase III: Testing and deployment in active service
    The last phase of the project will contain throught tests of all systems on-board the ship and crew training, followed by activation of the unit into active service, under one of the fleets.



Attachments:
[+]Additional Files
None.

Reply  
Offline Darius
11-15-2021, 07:58 PM,
#2
The Lion of Bretonia
Posts: 1,407
Threads: 303
Joined: Aug 2020

Kusari Naval Forces

[Image: bM9dE4l.png]

Transmission received
Code recognised as A-230-951-KUCOM
Decrypting....


Project A-200
"Yashima"-class Tokugawa
Status Update



Phase I

After the presentation of the project to the Admiral of the Naval Forces and its subsequent approval, Phase I is now in effect.
Kusari corporation will be briefed shortly about the required goods. The Core will be contacted about the procurement of Azurite Gas for the prototypes.

Further updates will be added after the completion of deliveries.



Attachments:
[+]Additional Files
None.

Reply  
Offline Darius
11-22-2021, 12:32 AM,
#3
The Lion of Bretonia
Posts: 1,407
Threads: 303
Joined: Aug 2020

Kusari Naval Forces

[Image: bM9dE4l.png]

Transmission received
Code recognised as A-230-951-KUCOM
Decrypting....


Project A-200
"Yashima"-class Tokugawa
Status Update



Phase II

As per the previous update and as according to the plans of the project, Samurai, Kishiro and the core have been contacted, each receiving a contract for the critical materials required for this project.



With Phase I completed, the second stage of the project is put into effect from 23rd of November 828 A.S.
Special convoys of the Naval Forces will be organized in the following days to transport the materials to Kure Shipyard.
Upon completion, the assembly will commence, in conjunction with limited-scale weapon tests, organized at Nansei Research Complex by both Kusari Intelligence and Naval Forces' operatives.

Estimated time until Phase II's conclusion is 1 month. Further updates upon the project will be made should the need arise and after the end of Phase II.



Attachments:
[+]Additional Files
Contracts: [1]; [2]

Reply  
Offline Darius
11-28-2021, 09:51 AM,
#4
The Lion of Bretonia
Posts: 1,407
Threads: 303
Joined: Aug 2020

Kusari Naval Forces

[Image: bM9dE4l.png]

Transmission received
Code recognised as A-230-951-KUCOM
Decrypting....


Project A-200
"Yashima"-class Tokugawa
Status Update



Phase II

With Phase II now in full effect, the prototypes of the RA-20 "Gale" batteries have been successfully assembled and mounted on the hull of the Yashima.

[Image: Prototype_1.png]

The materials delivered from the contract have arrived at Kure Shipyard on 25th of November; the majority of the improved hull plating has been completed and mounted on the Yashima. The "Taisho"-class armament is, at the current time, undergoing research at Nansei. Estimated date of completion is 10th December 828 A.S.



Due to the Naval Forces' need for reinforcements in the field, Phase III will be completed while in active service as part of one of the KNF Battlegroups.

The crew of the warship has been trained and is awaiting further orders at the Hokkaido Naval Garrison District. Once Phase II has been completed, the crewmembers will be recalled and the Yashima put into active service upon approval by the Admiral.



Attachments:
[+]Additional Files
None.

Reply  
Offline Darius
12-11-2021, 11:04 PM,
#5
The Lion of Bretonia
Posts: 1,407
Threads: 303
Joined: Aug 2020

Kusari Naval Forces

[Image: bM9dE4l.png]

Transmission received
Code recognised as A-230-951-KUCOM
Decrypting....


Project A-200
"Yashima"-class Tokugawa
Status Update



Phase III

Phase II has been succesfully completed on 10/12/828 A.S, with small delays due to a required replacement of the armor plating at the bow of the warship. The "Taisho"-class prototype batteries have been fitted onto the hull

Due to a delay in the project, Phase III is expected to begin on 15/12/828 A.S. The Admiral of the Naval Forces will be briefed about the state of the project; a request will be sent to the Hokkaido Naval Garrisson District for deployment into active service.

The A-200 project is henceforth marked as completed; Phase III will be represent the baptism by fire for the warship. Long live our Emperor and the proud Navy.



Attachments:
[+]Additional Files
None.

Reply  


  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2025 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode