![]() |
|
The IKN-Reiwa - Printable Version +- Discovery Gaming Community (https://discoverygc.com/forums) +-- Forum: Role-Playing (https://discoverygc.com/forums/forumdisplay.php?fid=9) +--- Forum: Stories and Biographies (https://discoverygc.com/forums/forumdisplay.php?fid=56) +--- Thread: The IKN-Reiwa (/showthread.php?tid=199067) |
The IKN-Reiwa - Empire of Kusari - 10-07-2023 Kusari Naval Forces
![]() Project "Reiwa"
"Amaterasu"-class Liner, modified. Status:Phase III, Finalised No outside parties will be made aware of the plans or construction. Workers and hired contractors will sign an agreement that prevents them from revealing information about the vessel to outsiders. Primary Objective: The latest Project for Kure Shipyard, labelled "Reiwa" is of uncommon nature to the Naval Forces. A joint venture between the Imperial Diet and the Naval Forces Headquarters, Project "Reiwa" aims to to transform an "Amaterasu"-class Luxury Liner into the preeminent vessel for diplomatic missions conducted by the Empire's highest representatives. The Amaterasu-class Luxury Liner, Samura Industries latest breakthrough in luxury ship building, quickly became renowned for its opulence and extravagance throughout the colonies - rendering it the ideal vessel to project Kusari's values and status whenever it arrives in foreign space. While it possesses formidable armaments and heavy armor, it falls short in terms of the advanced internal security measures required to safeguard the Empire's elite, a flaw to be corrected through this very project. Development phases:
Attachments: RE: The IKN-Reiwa - Empire of Kusari - 02-28-2024 Kusari Naval Forces
![]() Project "Reiwa"
"Amaterasu"-class Liner, modified. Status:Phase IV, Finalised No outside parties will be made aware of the plans or construction. Workers and hired contractors will sign an agreement that prevents them from revealing information about the vessel to outsiders. Phase III Status: Following the swift aid of Senkaku Regional Development, a Samura Industries subsidiary, all required materials arrived at Kure Shipyard four months ago. With the Nagasaki modernization efforts and the simultaneous mothballing of the Sado, Kure shipwrights could offer infrequent attention to the Reiwa only. With the highly sensitive security measures in place, further modifications will be sourced to one of the civil shipyards. Phase III is hereby concluded. Phase IV: All three two civil shipyards of Kusari will be contacted about their current capabilities and available timeslots. The most time efficient offer will be taken. The Reiwa will be transferred from Kure Shipyard to the designated shipyard. -> Concluded. Samura's Yokohama Shipyard possesses free capabilities. Further modifications to be installed there are:
Attachments: RE: The IKN-Reiwa - Empire of Kusari - 01-02-2025 Kusari Naval Forces
![]() Project "Reiwa"
"Amaterasu"-class Liner, modified. Status:Phase V, Finalised No outside parties will be made aware of the plans or construction. Workers and hired contractors will sign an agreement that prevents them from revealing information about the vessel to outsiders. Phase IV Status: Following the categorization of cargo lists and careful installment of the various security and sub-systems on board of Kure Shipyard and the subsequent fine tuning and late stage modifications conducted at Yokohama Shipyard, the procurement of armament has also been concluded through standard Naval Forces issued equipment. Phase IV is therefore concluded. Phase V: With almost a year in delays and reschedules, the IKN-Reiwa is virtually ready for its departure from the drydocks. Upon request of the Prime Ministry and the Shogunate, the vessel will be sent to Ichigaya Drydocks to receive further modifications in the form of an experimental type KJX-3 Jump Drive and a refitted Ikiryō-class cloaking device originally designed for Tokugawa-class hulls within the first week of 835 AS where it will remain for at least one week. February 835 A.S. amendment: The Office of Intelligence managed to secure a timeslot for the IKN-Reiwa and successfully adapted the KJX-3 Jump Drive intended for usage on modern Tokugawa-class Battleships to operate nominally and correctly interact with the vessels dual powerplants. However, the recent Omicron Mu campaign and the failures related to the IKN-Niyodo retrieval shifted priorities. Ichigaya Drydock and the KOI are no longer capable of aiding Project Reiwa. A suitable alternative for the Ikiryō-class cloaking device needs to be obtained through Keiretsu hands. Ionic Incorporated, a Kishiro subsidiary, and Musashi Innovations are legally approved cloaking device manufacturers and may prove sufficient to finalize Project Reiwa. 06.03.835: Phase V conclusion is to be expected within the next two weeks following swift assistance by Ionic Incorporated. Conclusive Statement: Preparations for the IKN-Reiwa's maiden flight can begin under the assumption that Phase V and all initial pre-flight checks conclude within the estimated timeframe of two weeks. Attachments: RE: The IKN-Reiwa - Emperor Tekagi - 03-27-2025 Kusari Naval Forces
![]() Project "Reiwa"
"Amaterasu"-class Liner, modified. Status: In Active Service Previous confidentiality regarding the IKN-Reiwa's existence is hereby lifted. Any and all details regarding the vessels internal restructuring and security measures remain subject to the previous confidentiality clause. 27.03.835 - Official Maiden Flight Phase V was reached on the 23th March. All final checks were positive. The IKN-Reiwa is hereby officially launched and has been handed over to the Imperial Guard of Kusari as requested. As Project head, I wish to sincerely thank the Imperial Diet, Kure Shipyards staff and everyone else involved in this project for their commitment to excellence. You have granted me, Hiroshi Yoshida, architect and advisor to his Imperial Majesty to work with all of you on this wonderful piece of art, this epitome of Kusari craftmanship and culture before my retirement. May the IKN-Reiwa traverse the vastness of Sirius for many decades. Attachments: |