• Home
  • Index
  • Search
  • Download
  • Server Rules
  • House Roleplay Laws
  • Player Utilities
  • Player Help
  • Forum Utilities
  • Returning Player?
  • Toggle Sidebar
Interactive Nav-Map
Interactive DarkMap
Tutorials
New Wiki
ID reference
Restart reference
Players Online
Player Activity
Faction Activity
Player Base Status
Discord Help Channel
DarkStat
Server public configs
POB Administration
Missing Powerplant
Stuck in Connecticut
Account Banned
Lost Ship/Account
POB Restoration
Disconnected
Member List
Forum Stats
Show Team
View New Posts
View Today's Posts
Calendar
Help
Archive Mode




Hi there Guest,  
Existing user?   Sign in    Create account
Login
Username:
Password: Lost Password?
 
  Discovery Gaming Community Role-Playing Unofficial Factions and Groups
« Previous 1 … 43 44 45 46 47 … 394 Next »
"Aegis"

Server Time (24h)

Players Online

Active Events - Scoreboard

Latest activity

"Aegis"
Offline Void Faes Nexus
05-04-2021, 05:59 PM,
#1
Member
Posts: 46
Threads: 21
Joined: May 2020

[Image: 0mwIksL.gif]
l̸̢̢͓͑̃͛̊̕͝ă̵̧̛͚̫͍͇͎͙̒̽͒̓͘ ̸͓͙̗͖̺͓̂̊̒̔́d̴̛̖̘̪̋̀i̶̖̹͓͇̰̱̎̐͝ͅv̷̨̢̪̏͌̐͊̇͂ḯ̸͉͎s̶̱̺̭̮̥̭͖̄̋̈́̓͘͠i̵̬̗͇̬̬̤̐̌̆̀̓͝͝ȍ̸̦̬̋͂́̕n̵̼̗̰̜̝̝̱̉̄͠ ̵̛͔͍̱́̓̄̽͘v̶͚̗̰̖̭̊̈́̈́̈́̏i̶͓̜͓̣̩͗̎͐̅ṕ̸̳̻͖̲̺̿ͅe̴͍̖͊̍̃͆̆ṛ̴̛͇̯͌͜e̸̗̤̦̜͌͆ͅ ̴̢̪͈̎͛̑̈́́ identification confirmed
password ̷̡̼̀ả̷̟͗͗́̅̀͑ͅĉ̶̲͚̗̀̕ͅc̴̛̖̜̈́̃̂͝ė̶̘́̎͠p̵̲̻̎̎̊̃̅̔̈́t̷͎͛̔̒͊̚͝e̶̱͓̟͉̩͐͛̋́̿̍̊d̵̨̡̻̝̩̀̆̃͂͠ͅ
̴͔̫͍̲̀̕ų̵̯̥̩̲͛̋̕͝ͅͅp̴͈͚̜̤̿͌͋̕͝l̵̻̱̝̦͖̙̍̄͠ȍ̶̧̻̦̞͕̥̏̎͠͝á̸̧̙̈͠ḏ̶̝̜̭̬̋͑͊͂ỉ̶̪͖̈́̍n̵̨̰̱̭̮̙̐́͑̊g̶̨͓̯̏̓͊̐̇ ̵̩͇͖̳̔ project data


"Aegis"




Project Aegis is one of the newest and highest value projects to the Faes leader called The Architect and her loyal scientists. This project focuses on a new reactor type that is thought for a single snub craft. A highly experimental material has been found that serves as their ground on this research. They will have to test and experiment with this rare material called The pillar man. The result of this research and the conclusions that come with it are far from being reached.



Phase One


[+]1.1 Initial scan and conclusions of the Pilarman

When they first discovered the commodity they were amazed by the information they got through the scans. They concluded that this material brings great possibilities if they could reach the point of success, which is why they started this project.

Complete

[+]1.2 Study and creation of possible stabilization chambers

While doing the initial scans of the Pilarman material huge spikes of radiation were detected. Through that and some evidence through the mindshare, it was decided that before conducting any kind of tests that a specific chamber has to be built in case of unwanted reactions with the material.

In progress

[+]1.3 Study and experiments with different chemical components

While some resources are still very rare for the Void Faes most chemical components are available to them. This is one of the most critical phases during the project since one wrong reaction could destroy them according to their initial scans.

Pending

[+]1.4 Experiments on potential energy harnessing ways

After all, the purpose of this project is to create a new reactor type that is more efficient and longer-lasting than usual. Because of this potential energy harvesting technology has to be developed and researched.

Pending


Phase Two



[+]1.1 First tests with potential reactor designs

After the first potential harnessing designs, the next logical step is to create a prototype reactor that is capable of producing a steady and controllable energy flow. This stage is close to the finish line yet a lot more has to be done towards making it fit into a small fighter craft.

Pending

[+]1.2 First full load tests with the prototype reactor

Such a reactor obviously has to undergo heavy stress and durability testings before it can be installed in a ship. This is another highly critical stage as the reactor could overload and explode. Yet the Void Faes are fairly well equipped with research facilities that are capable to withstand such explosions.

Pending

[+]1.3 Test fitting inside a small fighter craft

Once all the tests have been fully completed and have all been successful the first test fittings can be started. This includes possible rewiring of the whole ship and adaptation of existing powerlines as well as an exchange of already damaged components. First tests after the first install are also needed to be done to adjust the power output.

Pending
Reply  


Messages In This Thread
"Aegis" - by Void Faes Nexus - 05-04-2021, 05:59 PM
RE: "Aegis" - by Cortana Clark - 05-07-2021, 06:01 AM
RE: "Aegis" - by Cortana Clark - 05-11-2021, 06:29 AM

  • View a Printable Version
  • Subscribe to this thread


Users browsing this thread:
1 Guest(s)



Powered By MyBB, © 2002-2026 MyBB Group. Theme © 2014 iAndrew & DiscoveryGC
  • Contact Us
  •  Lite mode
Linear Mode
Threaded Mode